• Increase font size
  • Default font size
  • Decrease font size
Three Mile Island - Unit 1 Outage PDF Print E-mail

Merrick's recently successfully completed a project during Three Mile Island's - Unit 1 Outage. Our expert services were called upon to hydolaze the nuclear water inlet lines. The lines were restricted from a 30 inch pipe down to about 22 inches. Using the Rotary Hose Device (RHD) and 15,000 psi, Merrick's was successful in removing the fouling and returning the lines to their maximum flow rate. The RHD successfully navigated through 90 degee turns and verticle pipe sections. THe job was completed on time and safely.

Nuclear Water Inlet Before & After

picture2 picture1

 

 

Rotary Hose Device

Click to view video
View a video about the Merrick Group's Rotary Hose Device and the Pipe Cleaning Nozzle. It gets inside pipes and blasts away years of accumulated mineral deposits, scale, biological matter, and other debris that clogs pipes and restricts fluid flow. Learn more.

Need more info?

If you need more information about The Merrick Group, Inc., and how our capabilities and experience can help your project, just call us:

Phone: 570.455.0600
Fax: 570.455.5787